929 Rep. John Lewis Way S, Nashville, TN 37203 Main: 615.255.5593 24/7 Emergency Service (call or text): 615.566.8408
Amprite Electric Company logo
Home

Services

All Services Overview

Residential

★ Preventive Maintenance PlansElectrical RepairInterior LightingExterior LightingNew Circuits & PlugsHot Tub & Pool WiringBoat Dock WiringEV Charger InstallWhole Home GeneratorsWhole Home Surge Protection

Commercial & Industrial

Electrical RepairEquipment InstallationCommercial GeneratorsLighting Retrofits & UpgradesPreventive Maintenance (Commercial)Service & Panel UpgradesIndustrial Systems & ControlsInfrared Scanning

Testing & Safety

Infrared ScanningArc Flash StudiesLoad Studies

Construction

Commercial ConstructionIndustrial ConstructionLow Voltage & Cabling 24/7 Emergency Response — 615.566.8408

Service Areas

NashvilleFranklinBrentwoodMurfreesboroSmyrnaMt. JulietHendersonvilleAll Service Areas

Company

Our StoryOur TeamProject GalleryCustomer ListFAQAE Electric ServiceCareersContact
Call 24/7 Emergency Dispatch
Construction

Industrial Construction, Built Around Production.

Warehouse expansions, equipment and production line power, and water treatment facility electrical, installed by a contractor that plans the work around your uptime.

ServiceIndustrial Electrical Construction
CoverageGreater Nashville & Middle Tennessee
Direct Line615.255.5593
Why It Matters

The Plant Still Has to Run Tomorrow.

Industrial work is rarely a clean slate. The building is occupied, the line is scheduled, and the electrical upgrade has to happen around production rather than in place of it.

We plan industrial projects in phases, with temporary feeds, staged cutovers, and shutdowns booked with your maintenance team, so the new capacity comes online without costing you a week of output.

  • Warehouse and distribution center upgrades
  • Equipment and production line power
  • Water and wastewater treatment facilities
  • Service expansions and added distribution
Conduit bank rising to distribution panels during an industrial electrical installation by Amprite
How It Works

From Load List to Cutover.

01

Survey the Load

We walk the plant, review nameplate data and the existing distribution, and confirm what the upgrade actually has to carry.

02

Phase the Work

Feeders, gear, and branch work sequenced around production, with temporary power where a line cannot stop.

03

Cut Over & Commission

Shutdowns scheduled with your team, terminations verified, and the system energized and proven before we leave.

What You Get

Capacity That Holds Up.

i.

Sized From Data

Feeders and gear sized from real nameplate and measured load, not a rule of thumb.

ii.

Planned Shutdowns

Every outage scheduled with your maintenance team, with a written sequence.

iii.

Built for the Room

Wiring methods matched to washdown, corrosion, dust, and temperature.

iv.

Controls Included

Motor circuits, disconnects, and control wiring handled in-house.

v.

Inspection Ready

Permitting and utility coordination handled as part of the project.

vi.

One Contractor

Service, distribution, equipment power, and low voltage from a single crew.

Who This Serves

Facilities That Make Things.

We work for warehouses and distribution centers adding racking, conveyors, and lighting; manufacturers bringing in a new press, oven, or production line; and municipal and private water and wastewater treatment facilities upgrading pumps, motors, and controls.

We also support plant engineers and general contractors who need an electrical contractor comfortable working inside an operating facility, on a schedule that respects the production calendar.

Working Around Production

The Shutdown Is the Hard Part.

On an industrial job the wiring is rarely the constraint. The constraint is the window: how long a line can be down, which panels can be de-energized, and what has to stay live while the work happens around it.

That is why we start with the sequence rather than the material list. Temporary feeds where a process cannot stop, staged cutovers so the plant comes back in pieces rather than all at once, and every outage agreed in writing before anyone opens a panel.

Request a Quote
  • Phased, scheduled shutdowns
  • Temporary power where production cannot stop
  • Corrosion and washdown rated methods
  • Motor and control circuit work in-house
  • Utility coordination and permitting
  • Verified terminations before energizing
Questions

Industrial Construction FAQs

Can you work in an operating plant without shutting it down?

Yes. Most industrial upgrades happen around production. We plan the work in phases, use temporary feeds and after-hours or weekend windows where needed, and coordinate every shutdown with your maintenance team well in advance.

Do you handle power for new equipment and production lines?

Yes. We take equipment from the service and distribution through feeders, disconnects, controls, and final connection, sized from the nameplate data and installed so the line can be commissioned on schedule.

Do you work on water and wastewater treatment facilities?

Yes. We install and upgrade electrical systems for treatment plants and pump stations, including motor and pump circuits, control wiring, and the corrosion- and moisture-rated methods those environments demand.

Can you expand the electrical service in an existing warehouse?

Yes. We evaluate the existing service and distribution, size the upgrade for the new load, and install the service, panels, feeders, and branch circuits, coordinating the utility work and inspections along the way.

Built Around Production

Planning an Industrial Upgrade?

Talk to a licensed Middle Tennessee electrical contractor.